Chapter 16: The Rotary Foundation and CED Global Grants


The Global Grant, centerpiece of Rotary CED

The Rotary Foundation (TRF) is the financial arm of Rotary International. Each year it commits about USD 400 million across several programs, and Global Grants are the largest funding line for clubs' CED projects.

A well-run CED Global Grant brings in anywhere from USD 30,000 to more than USD 400,000, over 12 to 36 months, with TRF leverage on local co-financing. It is the most powerful financial tool a club has for turning a diagnosis into a project on the ground.

This chapter details the full Global Grant cycle, from first concept to closure, with the required documents, timelines, pitfalls and indicators to track. Some amounts and ratios are flagged [to be verified]: TRF has reformed its funding model in recent years and keeps adjusting it. Refer to the current version of the Terms and Conditions for Rotary Foundation Grants for the exact values at the time of submission.


The eight phases of the cycle

A Global Grant follows an eight-phase cycle. Each phase has its deliverables, its contacts and its typical timelines.

Phase 1: Identification (1-3 months)

The club's diagnosis of its area, first community meetings, identification of a priority CED issue, first discussions with potential local partners. The club's CED committee confirms that a Global Grant project is relevant and feasible.

Deliverable. A 2-3 page statement of intent for the club committee and for the district's DRFC.

Phase 2: Design (3-6 months)

The methodological core. Community Needs Assessment carried out (Chapter 9), theory of change formulated, international partner identified and committed, detailed budget built, M&E plan written, local partners formalized through MOUs.

Deliverables. Complete concept note, CNA report, partnership MOUs, line-item budget, M&E plan.

Phase 3: Submission (1-2 months)

The complete application is filed in the My Rotary Grant Center. Attached documents, electronic signatures of the club president, the district's DRFC, the DG, and the international club and district. Final check by the DRFC before it goes to TRF staff.

Deliverable. Application submitted on my.rotary.org through the Grant Center.

Phase 4: TRF review (2-4 months)

Review by TRF staff. Clarification questions sent to the club and the district through the Grant Center. Adjustments requested to the budget, indicators or components. The Cadre's opinion sought if a technical component is complex. Final decision.

Deliverable. Notification letter (approval, request for revision, or rejection).

Phase 5: Transfer of funds (2-4 months)

After approval, the co-financing must be paid in full before any payment goes out: DDF, cash from the club and the international partner, documented in-kind. TRF then releases the World Fund match and the total to the host district's USD account. The district then pays the club according to the approved schedule.

Deliverables. Deposit confirmations, first payment.

Phase 6: Implementation (12-36 months depending on the project)

Carrying out the project in line with the budget, the schedule and the M&E plan. Rigorous financial management, ongoing documentation, indicator tracking, any adjustments approved by TRF.

Deliverables. Financial records, internal quarterly reports, photos, M&E data.

Phase 7: Stewardship and reporting (ongoing + at 12 months + at the end)

Three formal reports to TRF:

  • Progress report every 12 months after the first payment
  • Final report within two months of the end of the project
  • Any specific interim report requested by TRF or initiated by the club in case of a major change

Deliverables. Narrative and financial reports submitted through the Grant Center.

Phase 8: Closure (2-6 months after the end of the project)

TRF approval of the final report, official closure of the grant, documents archived for at least five years. Ex post evaluation at 12-24 months when the project lends itself to it (not always funded by the grant itself, but recommended).

Deliverables. Official closure, archived file, final feedback to stakeholders.

Typical total duration: 20 to 48 months from identification to closure. Accept this duration as a given from the start.


Documents required for submission

The complete application for a CED Global Grant includes about ten documents. Each takes time to prepare: several weeks to several months depending on complexity.

Main documents

Document Typical length Main author
Concept note / application narrative 15-30 pages Host club (with international partner)
Detailed line-item budget 3-10 pages (Excel) Host club (DRFC approval)
Monitoring and evaluation (M&E) plan 5-10 pages Host club (with local partner)
Community Needs Assessment report 10-25 pages Local partner with host club support
Host club / international club MOU 1-3 pages Both clubs, DRFC approval
MOUs with local partners (MFI, NGO, cooperative) 1-5 pages per partner Host club
Letters of support (local authorities, institutional partners) 1 page each Authorities / partners
CV of the host club's project leader(s) 1-2 pages The people concerned
Proof of committed co-financing (pledge letters) 1 page per pledge Signatories of the pledges

Supporting items that often help

  • Photos of the area and the target community (with consent)
  • Location maps
  • Sector studies or statistical documents
  • Templates for beneficiary registers, tracking, etc.

The concept note: a winning structure

The concept note is the central document. Its structure follows the TRF template available in the Grant Center. Here are its sections, with the points TRF staff scrutinize most.

Section 1: Project information

Project title, geographic area, Area of Focus (CED), amount requested, duration.

Section 2: Project description (2-4 pages)

The problem the project addresses, target population, expected results, summary theory of change. This section is often read first and shapes the reviewer's impression. Clear, concise, concrete: no generalities.

Section 3: Community

Description of the beneficiary community: demographics, economy, context, vulnerabilities. Grounded in the CNA.

Section 4: Partners

Host club, international club, local partners (cooperating organizations). The role of each, demonstrated capacity, track record in the sector.

TRF staff check:

  • Is the international partner really involved, or just a signatory?
  • Is the local partner competent on the project's specific subject?
  • Are the roles clear and not redundant?

Section 5: Project objectives and activities

Objectives framed as measurable outcomes, activities detailed by component, schedule. Consistency with the budget.

Section 6: Budget

Every budget line is justified. Typical TRF categories: personnel (limited), equipment, supplies, transportation, training, monitoring and evaluation, administration (3% cap), contingency (10% cap).

Section 7: Standardized measures and M&E plan

Indicators aligned with the Rotary Standardized Measures for the CED area of focus. Planned baseline, measurement frequency, person responsible, method.

Section 8: Sustainability

How the project continues after the grant ends. Self-supporting business model, handover to a local operator, integration into public policy, training of trainers, etc. This is the section most often underdeveloped, and one of the most closely scrutinized.

Section 9: Community involvement

How the beneficiary community is involved in design, implementation and evaluation. Grounded in the CNA and in formal participation mechanisms (beneficiary committee, surveys, feedback sessions).


Budget: rules, caps, practices

Typical TRF categories and caps [to be verified in the current version]

Category Description Cap or practice
Equipment Durable purchases, technical equipment Eligible, receipts required
Supplies Supplies, raw materials Eligible
Training Trainer fees, teaching materials Eligible
Transportation and logistics Activity-related costs Eligible, flat rates or receipts
Local personnel Fees for staff dedicated to the project Eligible under TRF rules
International travel Travel by the international club Limited, must be justified
Administration Overhead for managing the project 3% cap on the total budget
Contingency Reserve for unforeseen costs 10% cap on the total budget
External evaluation Independent consultant Eligible, recommended for projects > USD 100,000

Common ineligible expenses

Category Reason
Construction of permanent buildings for club use Not the purpose of a CED Global Grant
Vehicles, motorcycles, boats Unless directly and demonstrably essential to the project
Salaries of the club's or partner's regular staff Only costs dedicated to the project are eligible
Meals and lodging for Rotarians Paid by the clubs, not by TRF
Expenses incurred before grant approval Only later expenses are eligible (except a pre-project CNA in some cases)
Rotary giveaways, club visibility materials Club budget, not the grant

Co-financing: the ratios

The total project amount is greater than the amount requested from TRF. It includes the required co-financing.

Source of co-financing World Fund match ratio [to be verified]
DDF (District Designated Fund) from the host or international district 100%: each DDF dollar is matched by one World Fund dollar
Cash from clubs or partners 50%: each cash dollar is matched by 50 cents from the World Fund
Documented in-kind contributions 0%: counted toward the project total but not matched

Illustrative example with figures. A USD 100,000 project might be structured like this:

  • USD 20,000 DDF (matched with USD 20,000 by the World Fund) = USD 40,000
  • USD 20,000 cash from host club + international club (matched with USD 10,000) = USD 30,000
  • USD 30,000 in-kind (not matched) = USD 30,000
  • Total = USD 100,000, of which USD 30,000 from the World Fund and USD 70,000 contributed by the clubs, DDF and in-kind

This mechanism explains why DDF is the most powerful lever: USD 1 of DDF produces USD 2 of project funding, while USD 1 in cash produces USD 1.50.

The exact rules of the funding model may change. Check with the DRFC and in the Terms and Conditions for the year in question.


Monitoring and evaluation (M&E) plan

The M&E plan is often underdeveloped in CED applications, even though TRF staff read it carefully. A strong M&E plan lines up indicators, methods, schedule and responsibilities.

Typical structure

Project outcome Indicator Baseline Endline target Measurement method Frequency Responsible
Higher beneficiary income Average monthly income per beneficiary (USD) Measured at M0 +40% at M24 Household sample survey Baseline M0, endline M24 Local partner
Lasting funded activities % of activities still active at 12 months 0 (not yet started) > 70% at M24 Follow-up survey M12, M18, M24 Local partner
Microcredit repayment rate (if applicable) PAR 30 N/A < 5% MFI reporting Quarterly Partner MFI
Access to formal financial services % of beneficiaries with a bank or mobile money account Measured at M0 +30 pp at M24 Endline survey Baseline, endline Local partner

The M&E plan is built during the design phase, not after the grant is awarded. It determines the quality of the stewardship reports.


The Rotary Standardized Measures for CED

TRF publishes a list of standardized indicators for each Area of Focus. For CED, the recommended indicators cover several levels:

  • Number of direct beneficiaries (disaggregated by gender)
  • Estimated number of indirect beneficiaries
  • Additional income generated
  • Jobs created or maintained
  • Measured poverty level (Poverty Probability Index or equivalent)
  • Access to formal financial services
  • Indicators specific to the subtopic (training, cooperative, value chain, etc.)

The project must adopt these standardized indicators and may add more precise indicators of its own. Alignment with the standardized measures is a good practice TRF staff look for.

The current list is available on my.rotary.org > Grants > Monitoring and Evaluation Plan Supplement.


The 10 most common reasons for rejection

TRF staff do not publish official statistics on reasons for rejection, but experienced coordinators agree on ten recurring causes. Anticipating them early drastically reduces the risk of losing six months.

# Cause Mitigation
1 Superficial or missing Community Needs Assessment Chapter 9, rigorous method
2 Inadequate international partner (just a signatory, not a real partner) Early outreach through RAGCED, two-way partnership
3 Budget not itemized, admin over 3%, contingency > 10% Line-by-line review, help from an accountant in the club
4 Sustainability not addressed or addressed superficially Explicit sustainability model, no generic formula
5 Vague indicators (improved well-being measures nothing) SMART indicators, planned baseline
6 Ineligible expenses mixed into the budget Strict check against the eligibility list
7 Vague or overlapping partner roles Clear RACI matrix, no overlapping responsibilities
8 No demonstrated community involvement Formal participation mechanisms, grounded in the CNA
9 District or club not qualified Early check of TRF qualification
10 Earlier stewardship reports overdue Audit of open reports before starting a new project

An application that checks all ten mitigations stands every chance. One that misses three or four triggers time-consuming requests for clarification, or even a rejection.


Stewardship obligations

Stewardship is the obligation to account for the use of TRF funds. Three formal reports, plus ongoing documentation obligations.

Annual progress report

Submitted through the Grant Center every 12 months after the first payment. It describes:

  • Activities carried out since the last report
  • Line-by-line expenses (compliance with the budget)
  • Indicators measured (baseline at M12, interim values after that)
  • Difficulties encountered, adjustments
  • Commitments for the next 12 months

The report is signed by the host club and the international club, and approved by the DRFC before submission.

Final report

Within two months of the official end of the project. It documents the whole cycle, the results achieved, the lessons learned and the sustainability set in motion. It is the document TRF will use to judge the project's success, and the one it will rely on for the club's and district's future applications.

Ongoing obligations

  • Supporting documents kept for at least five years after closure
  • Availability for a possible TRF audit (rare but possible)
  • Photos documenting the activities, with consent
  • Beneficiary registers kept up to date

Consequences of noncompliance

Breach Consequence
Late progress report Remaining payments frozen, reminder from the DRFC
Final report not submitted Club and district placed in default, any new application blocked for the entire district
Expenses that cannot be justified Request to refund the unjustified portion
Proven fraud Disciplinary procedure, expulsion, prosecution

A club that fails to meet its stewardship obligations harms every other club in the district. This negative externality justifies the rigor required of every club that takes on a grant.


The DRG, Global Grant, Global Grant sequence

For clubs that have also run a Disaster Response Grant (see the twin book on disaster response), a post-crisis CED sequence can be structured like this:

  • DRG in the first 72 hours to 3 months (emergency)
  • Transitional CED Global Grant at M+6 / M+12 to restart the damaged local economy
  • Structural CED Global Grant at M+24 / M+36 to put lasting mechanisms in place (microfinance, cooperatives, restored value chains)

This sequence is documented in several RAGCED × DNA-RAG projects (notably after hurricanes in the Caribbean, earthquakes after Haiti, etc.). It provides consistent continuity from emergency to structural recovery.


Checklist for a CED Global Grant ready to submit

  • Concept note complete and reviewed by RAGCED and the DRFC
  • CNA attached, less than 12 months old
  • Genuine international partner (not a partner in name only)
  • Partnership MOUs signed
  • Line-item budget, admin ≤ 3%, contingency ≤ 10%
  • Co-financing committed with pledge letters
  • M&E plan with SMART indicators, planned baseline
  • Sustainability spelled out with a concrete model
  • Community involvement documented
  • CED Standardized Measures aligned
  • Ineligible expenses removed from the budget
  • Signatories identified, GMS up to date
  • TRF qualification of the district and the club checked
  • Earlier stewardship reports up to date
  • Internal human resources available for the next 24-36 months

Rigor as an investment

A well-run CED Global Grant delivers a triple benefit: the project itself, a stronger club, and credibility built up with TRF and RAGCED for the next projects. A club that has properly carried out two or three CED Global Grants becomes a recognized player: its name gets around, its partners propose collaborations, and the district counts on it to support clubs that are just starting.

That reputation is not built on one grant. It is built by keeping every one of them up to standard. Today's rigor is tomorrow's access to opportunities.

The next chapter describes the expert partner that supports this entire journey: RAGCED, its exact role, its concrete services, its committees and its regional chapters.