When does a pilot deserve to be replicated?

A well-run CED project demonstrates an effect on a specific community over a limited period. The next question is almost inevitable: can we reproduce this effect elsewhere, on a larger scale, for more beneficiaries? That is the subject of scaling up, or scaling in the development literature.

Not every innovation can be replicated. A project that worked here may fail elsewhere because of context. A model that worked on a small scale may deteriorate as it grows. Scaling up is neither automatic nor easy: it is a demanding exercise that calls on different skills from the original project.

This chapter covers the conditions for scaling up, the Rotary tools suited to it (in particular Programs of Scale), the possible forms of replication, and the point at which a club does better to hand over its model to a larger operator than to try to carry the expansion itself.


The three conditions for scaling up

Before talking about expansion, a club checks three conditions. Without them, replication repeats the initial effort without multiplying the impact, or even produces disappointing results that damage the credibility of the approach.

Condition 1: Proven effectiveness

The pilot project produced measured results, with a rigorous baseline and endline. Not just testimonials, photos and good feelings. Numbers: additional income, jobs created, survival rate of the activities financed, indicators aligned with TRF standards.

This data lets you say: "out of 250 beneficiaries, 180 increased their income by more than 30%, 85% of the activities financed are still active at 24 months, the microcredit repayment rate is 96%." These figures ground the conviction that the model works and deserves to be replicated.

Condition 2: A transferable theory of change

Can what worked be reproduced elsewhere? What are the necessary conditions, some tied to the local context, others to the method?

A transferable theory of change is one that clearly identifies:

  • Which elements are contextual and will not be reproduced identically (a personal relationship with a specific community leader, the support of a particular mayor, a one-off market opportunity)
  • Which elements are methodological and can be reproduced (the structure of the training, the cooperative's governance model, the borrower assessment grid, a partnership with a type of MFI)
  • Which elements are structural and require minimum conditions (legal framework, literacy level, density of complementary actors)

A model that does not distinguish these three levels gets copied blindly and partly fails.

Condition 3: The institutional capacity to carry the scale

A USD 100,000 project in one municipality has its own logic. The same model rolled out across ten municipalities is a USD 1,000,000 program, with management, supervision and coordination demands far beyond what a single club can carry.

Scaling up requires:

  • A lead organization able to run a multi-site program
  • Formalized, documented processes, not homemade practices
  • A paid or quasi-paid team, not only volunteers
  • An information system that allows consolidated monitoring
  • Funding that matches the new size

No Rotary club has these capacities on its own. An experienced club can initiate scaling up; it cannot carry it alone.


The three forms of scaling up

Form 1: Horizontal replication

The same model, reproduced in other areas. For example: a vocational training center in Ouagadougou, then a similar center in Bobo-Dioulasso, then in Koudougou. Each center is autonomous and adapted to the local context, but follows the same method.

Horizontal replication multiplies the number of beneficiaries without changing the nature of the project. It is the most accessible form for a club taking on scaling up: the model is known, the early mistakes are behind you, and each new site benefits from experience.

Form 2: Vertical deepening

The same area, but with additional services. For example: after a microcredit project, add a financial literacy component, then an inclusive insurance scheme, then support for micro-entrepreneurship. Each beneficiary gradually gains access to a bundle of services.

Vertical deepening turns one-time beneficiaries into long-term clients. It strengthens the impact per beneficiary without increasing their number.

Form 3: Systemic transformation

The model influences the system it is part of. For example: a training center whose method is adopted by the Ministry of Education for its reform of vocational high schools. A VSLA method rolled out regionally by an international NGO. A cooperative model built into a national program supporting agricultural value chains.

Systemic transformation is the most ambitious. It takes years of advocacy, impeccable documentation, and political and institutional allies. It is also the form of impact that truly changes the rules of the game for entire populations.


Rotary tools for scaling up

A second Global Grant in the same community

The simplest form: a club that has carried a first CED Global Grant submits a second Global Grant in the same community, to consolidate or extend. A similar or larger budget, the same partners plus new ones, new components.

This vertical deepening pattern is common and natural. Clubs that adopt it accumulate USD 500,000 to 2,000,000 invested in the same community over 5 to 10 years, with lasting, measurable effects.

A series of coordinated Global Grants

Several clubs in the same district carry Global Grants built on the same model, in different areas. The District CED Chair coordinates, experiences are shared, and technical partners are pooled.

This district-level horizontal replication pattern requires strong coordination at district level and an active District CED Chair. Where it exists, it creates a district-wide CED momentum that draws in other clubs.

Programs of Scale

Programs of Scale are a specific TRF funding line, launched in 2020, devoted to large-scale projects with measurable impact at the level of a region or a country.

Feature Value
Budget USD 2,000,000 funded by TRF per year, one competitive selection [current amount to be verified]
Duration Up to 3 to 5 years
Selection Competitive, one or two projects chosen per year
Prerequisites Proven experience with the model, evidence of impact, a consortium of actors, significant co-financing
Lead A lead club plus a consortium

A CED Program of Scale is rare but not out of reach for an experienced club that has joined a credible consortium of actors. The application process spans several months and goes through an expression-of-interest phase followed by a full application.

For more information, see my.rotary.org > Grants > Programs of Scale and contact RAGCED for support.

Expanded Packaged Grants

Some TRF Packaged Grants (notably with Oikocredit for microfinance) provide a ready-made framework for projects that can be replicated easily. For a club that has validated a microfinance model through a standard Global Grant, a Packaged Grant makes a second phase smoother.

Partnerships with mid-sized NGOs

An NGO already working in the sector can inherit a model validated by a Rotary club and replicate it in its own area. The club becomes a source of inspiration more than an operator. This transfer is rarely formalized by a contract: it happens through shared documentation, presentations and informal mentoring.


The pitfalls of scaling up

Pitfall 1: Mechanical replication

Transposing a model unchanged into a different context, with no adjustment. The training center that worked in Kinshasa will not necessarily work the same way in Bamako. Legal contexts, the trades in demand, the availability of trainers, the purchasing power of trainees: everything varies.

Mitigation: systematic adaptation. Each replication starts with its own CNA, an adaptation study and documented methodological adjustments.

Pitfall 2: Diluted leadership

A pilot project often has a charismatic leader who carries its energy. When it is replicated, that leader cannot be everywhere. The following sites lack the same intensity.

Mitigation: train multiplier leaders. Identify and train successive leaders during the pilot, not after. Document leadership practices so they can be passed on.

Pitfall 3: Quality loss as volume grows

Approaches that work on a small scale can deteriorate as volume increases. Close supervision becomes impossible as sites multiply. Informal processes that worked with ten beneficiaries become erratic with a thousand.

Mitigation: systematize before scaling. Document processes, train staff, set up an information system, define verifiable minimum quality standards.

Pitfall 4: Burnout in the lead club

A club that has run a successful pilot often underestimates the energy that scaling up requires. Coordinators burn out, volunteers reach saturation, operational routine swallows all the available space.

Mitigation: hand over when the time is right. A club that has proven itself on a pilot is not obliged to carry the scale-up. It can transfer the model to an organization better sized for expansion.

Pitfall 5: Original partners out of their depth

The local partner that ran the pilot with excellence may not have the capacity to carry the scale-up. An MFI with 5,000 clients does not easily become an MFI with 50,000 clients.

Mitigation: an honest assessment of partners before ramping up. If needed, new partnerships for the new sites, or backing from a regional network.

Pitfall 6: A context-dependent model

Some CED projects owe their success to a specific context: a favorable political relationship, a growing sector market, no local competition. These conditions do not repeat elsewhere.

Mitigation: a context diagnosis before any decision to replicate. The CNA for each new site explicitly includes an analysis of the conditions the model needs.


How a club decides whether to scale up

A club that has carried a CED project through to the end has three options to consider.

Option 1: Stay with the pilot

Consolidate, make it last, document it, do not expand. Hand over to a local institution that takes over the scheme. The Rotary club has played its part: it does not itself become the large-scale operator.

This option is often the wisest. A club that knows when to stop once the pilot is complete does a service to the community and to itself.

Option 2: Deepen in the same community

A second Global Grant in the same area, with new components or consolidation. A deeper relationship with the community, accumulated learning.

This option comes naturally to a club that has invested time and relationships in a specific area. It can unfold over 5 to 10 years.

Option 3: Replicate elsewhere

A new area, the same model, adapted. Either a new Global Grant carried by the same club, a transfer to another club that draws on the model, or a consortium for a Program of Scale.

This option requires the rigor described above. It is not mandatory, and for some highly contextual models it may never be relevant.

Criteria for deciding

A few concrete criteria to help the decision:

Criterion Favors scaling up Against
Measured pilot results Clear impact, lasting at 12 to 24 months Ambiguous results, uncertain durability
Transferability of the model Documented, transferable, adaptable Highly dependent on the specific local context
Club capacity Stable coordinator, mature CED committee, active Foundation Chair Tired team, difficult presidential rotation
District appetite Engaged DRFC, active District CED Chair, interested neighboring clubs District not very engaged, no relay
Existing partners Quality partners for new sites Partners exhausted or limited to the original area
External demand NGOs and institutions ask for the method No outside requests

Advocacy with public authorities

The most powerful scaling up is the kind that ends in integration into public policy. A training method adopted by the Ministry of Education, a cooperative model built into the policy supporting agricultural value chains, a financial inclusion approach taken up by the central bank: these transformations truly change the scale.

This advocacy requires:

  • Rigorous documentation: public decision-makers want verified figures, not activist stories
  • Institutional relationships: patience, continuity, an understanding of administrative constraints
  • Political allies: people within the system who champion the cause
  • A favorable political moment: sector reform, a change of government, a government priority
  • Coordination with major actors: UN agencies, bilateral donors who also support the cause

A club alone does not carry such advocacy. It contributes to it: by documenting its pilot, by being available for official visits, by speaking in consultation forums. The partner organizations (national NGOs, UN agencies, foundations) lead the political advocacy.


Transfer to a long-term operator

In many cases, the best scaling is transfer. A Rotary club has shown that a model works; a larger, better-sized organization with lasting resources takes it up and carries it to a scale the club could never have reached.

This transfer is prepared:

  • Complete documentation so the model can be passed on
  • Support for the transfer: exchange visits, attending meetings, training the new leads
  • Keeping the link with the original community: the Rotary club remains an attentive observer, not an implementer
  • Shared recognition: the transfer is not a withdrawal, it is broader cooperation

A club that accepts this role of catalyst rather than permanent operator achieves far greater impact than it could have by remaining the sole operator.


The special case of a Program of Scale as host club

For a club that wants to apply for a Program of Scale as host club or main partner:

Formal prerequisites

  • At least three Global Grants carried through to completion, with approved final reports
  • Spotless TRF district qualification for several years
  • Demonstrated capacity to coordinate multiple actors
  • A partner consortium in place, with formal commitment

Application phases [to be verified in current TRF documentation]

  1. Expression of Interest (EOI): a short letter describing the proposed project
  2. Shortlisting
  3. Full application (detailed proposal)
  4. Final selection
  5. Contracting

What changes compared with a standard Global Grant

  • Budget scale (USD 2 million per year rather than USD 30,000 to 400,000)
  • Duration (3 to 5 years rather than 12 to 36 months)
  • Coordination complexity (a consortium of 3 to 6 actors)
  • Even more demanding documentation and M&E rigor

A CED Program of Scale is a career commitment for a CED coordinator. It is not undertaken lightly. But for a mature club it can be the natural culmination of a decade of commitment to CED.


Checklist

Before deciding

  • Rigorous evaluation of the pilot's results (indicators, durability at 12 to 24 months)
  • Distinction made between contextual, methodological and structural elements
  • Model documented thoroughly enough to be passed on
  • Club's institutional capacity honestly assessed
  • District appetite identified
  • RAGCED and potential partners consulted

If the decision is to replicate

  • A specific CNA for each new site
  • Documented methodological adaptation
  • Local partners assessed for each new site
  • Processes systematized to handle the volume
  • Human resources sized accordingly

If the decision is to transfer

  • Receiving organization identified and committed
  • Complete documentation handed over
  • Transfer supported over 6 to 12 months
  • Link with the original community maintained
  • Mutual recognition formalized

If the decision is to apply for a Program of Scale

  • Formal prerequisites checked
  • Partner consortium formed and committed
  • EOI file prepared
  • Multi-year budget estimated
  • Stable human resources planned for 3 to 5 years

The lesson of scaling up

Scaling up is a possible culmination of a mature CED project. It is neither mandatory nor automatic. A club that has carried a pilot to completion, transferred it to a lasting local institution and drawn lessons from it for itself has not failed to scale up: it has simply played its part where it was most useful.

The question is not "how do we get bigger?" but "what form of impact best fits what Rotary can specifically contribute?" Sometimes it is the completed pilot, handed over; sometimes horizontal replication across several districts; sometimes vertical deepening; sometimes an ambitious Program of Scale. All these forms are legitimate.

Part V is now complete. The club knows how to make its work last, document it, debrief it, and consider scaling up. Part VI brings together the practical sheets by type of CED project: seventeen project types presented in two pages each, meant to be printed, filed in the coordinator's kit, and consulted quickly during operations.